MPS / DRP
Balance load and capacity, replenish without stockouts
Ganacos calculates your master production schedule from consolidated demand: load and capacity by resource, bills of materials and routings, replenishment constraints. The DRP engine then propagates requirements across your multi-level warehouses and generates reliable order proposals.


Functional scope
Key capabilities
A production plan that matches your real capacity
The master schedule matches consolidated demand against your real resources, routings and bills of materials included.

Requirements propagated across every warehouse
The DRP engine propagates requirements across your multi-level warehouses and generates reliable order proposals.

Inventory under control, connected to your ERP
Alerts flag stockouts before they happen, and approved orders flow straight back to your ERP.



